Windows tutorials › Activity
ActivitySee older activity
Load lines further back than the first page of the list.
Before you start
- The project has a long history.
Steps
Scroll to the bottom of a long list and click Show older activity.
The page first shows the latest 200 lines. The button adds 200 more each time you click it, up to 1,000 lines in all. When the button no longer appears, or is greyed out, there is nothing more to load.
What you get
Older lines are added to the bottom of the list.
Watch out for
- Activity shows the latest 1,000 lines at most. The filter works on the lines that are loaded.